Every tranny and driver will be different to some degree. Start with 100% TC delay and no more than 25% line pressure increase. Pay close attention to directions as the 2 pots turn in opposite directions for increase. Use the included tie wraps to attach the Interceptor to the wiring harness that runs down by the shift linkage - double check that it is away from the hot exhaust components.