In your opinion, how long should it take a "professional" shop to do the fallowing.
1.Drain break fluid
2.Replace breaklines(swap out kit)
3.Replace 4 rotors and pads.
4.Pack berrings and new seal.
I say if I had the tools and the room, I could do it in a 2 hours.
What'da you think?


 
						
					 
					
					 
				
				
				
					 Reply With Quote
  Reply With Quote