I passed both the Federal and Provincial inspections today having that pin from the relay connected to a fuze for AC. Once I passed both inspection I removed the wire from the fuze and no more DRL. So as the easiest temp DRL to pass inpections it will work. I don't think it's any good for a long term DRL and if anyone plans on having it long term, it should be done properly as one of those proposed diagrams.