switched up the connection system. newest battery terminals & anl fuse holders from jl (much better design on these than the old systems):
150amp h/o alt showing connection terminal to pos. post:
along with the new alt i'm also doing the big three (3) with 2/0ga power/ground.![]()
once the alts in i'll have all wires ran - and will be ready to move on to enclosure fabrication. this include the doors, kick panels, and sub enclosure.
(let me tell ya... getting 3 runs of beefy 12ga wire run through the door boots was no small feat by any stretch of the imagination.)
sooooo much to do yet.![]()
![]()
-biju.