
been doin' a lot of ^ lately. need more freaking time before moab. grrrrrr...
(tick. tick. tick. tick. tick. tick...)
seriously, i'll give a non-pictoral update. (no pix until after moab!...)
DONE:
- the big 3
- h/o alternator
- sound proofing
- rca's run
- speaker cable run
- security system
- neon cables run
- head unit
- bbe processor
- oem fog switches for neon
- firewall grommets
- 2/0ga power ground run
- sub enclosures
- custom battery tray
- custom xover/eq mount
- custom ddc controller mount
- front tweets
- front mids
- front midbass
every single item above has been a battle. consumed more time than it should have. and required several trips to the store (hardware, etc.) eventho i tried to have everything already handy.
i refuse to do a shoddy job, or throw stuff together - which has made this incredibly difficult for me. the details are enough to drive me mad, but nothing a few xanax won't help. details, details, details... every step of the way.
what's left is the custom amp rack, wiring (hooking components up), and final beauty (cover/vinyl) boards in some areas... i have 13 days left to make this puppy work before moab. we'll see....
-biju.
(p.s. - i purchased equip to provide rear fill mids/tweets/midbass. at this time i'm wiring it up, but won't have time to do the custom work to complete the rear fill before zu. that phase i'll tackle after moab. essentially, to make this work something had to give. rear fill got the chop. for now...)
*
He lingers -- happily -- in a new hybrid state of semi-hormonal adolescence and responsible self-reliance.
*